Call Us Today! 1.530.892.1918|info@rhci.co

Schools

Home/Schools
Permalink Gallery

College of the Siskiyous Rural Health Sciences Institute

College of the Siskiyous Rural Health Sciences Institute

,

A new 20,172sqft competitively bid project with final value of $7,998,335. RHCI self-performed all the concrete, framing, and finish carpentry on this project. The main entry of the building includes a two and a half story tall concrete tower with custom steel sign art. The Rural Health Building is located in Yreka California which was a considerable distance for the subs to travel. The weather is extremely cold during winter months causing labor to be scheduled for maximum results. Despite delays caused by negotiations with the City and owner the project was completed ahead of schedule.

[images lightbox=”yes”]
[image link=”” linktarget=”_self” image=”http://rhci.co/wp-content/uploads/2014/03/8-4-09-COS-RHSI-Yreka-2.jpg” alt=””]
[image link=”” linktarget=”_self” image=”http://rhci.co/wp-content/uploads/2014/03/8-4-09-COS-RHSI-Yreka-121.jpg” alt=””]
[image link=”” linktarget=”_self” image=”http://rhci.co/wp-content/uploads/2014/03/8-4-09-COS-RHSI-Yreka-15.jpg” alt=””]
[image link=”” linktarget=”_self” image=”http://rhci.co/wp-content/uploads/2014/03/COS-Yreka-739.jpg” alt=””]
[image link=”” linktarget=”_self” image=”http://rhci.co/wp-content/uploads/2014/03/8-4-09-COS-RHSI-Yreka-10.jpg” alt=””]
[image link=”” linktarget=”_self” image=”http://rhci.co/wp-content/uploads/2014/03/8-4-09-COS-RHSI-Yreka-19.jpg” alt=””]
[image link=”” linktarget=”_self” image=”http://rhci.co/wp-content/uploads/2014/03/8-4-09-COS-RHSI-Yreka-11.jpg” alt=””]
[/images]

Permalink Gallery

College of the Siskiyous Science Building

College of the Siskiyous Science Building

Newly constructed 21,000sqft, two story building serviced with Otis elevator. The classrooms consisted of lab casework with epoxy tops, fume hoods with stainless steel ducting and window shade systems capable of room darkening by remote. Built in equipment included refrigerated cadaver storage, chemistry refrigerators, and hydronic heated floors. The exterior of the building has roof and gutter snow melt while the walkways are kept free of ice with hydronic heat under the winding paver paths. Custom art work on FRL panels line many of the walls and cedar wood ceilings are on both floors as well as the solar atrium. The project was completed on time despite a large portion of the project being completed during the winter with a lot of snow. The project is located in Weed, CA which is a very remote area, but the project was still completed under budget.

[images lightbox=”yes”]
[image link=”” linktarget=”_self” image=”http://rhci.co/wp-content/uploads/2014/03/081012C.jpg” alt=””]
[image link=”” linktarget=”_self” image=”http://rhci.co/wp-content/uploads/2014/03/081012B.jpg” alt=””]
[image link=”” linktarget=”_self” image=”http://rhci.co/wp-content/uploads/2014/03/080312A.jpg” alt=””]
[image link=”” linktarget=”_self” image=”http://rhci.co/wp-content/uploads/2014/03/080312C.jpg” alt=””]
[image link=”” linktarget=”_self” image=”http://rhci.co/wp-content/uploads/2014/03/081012D.jpg” alt=””]
[image link=”” linktarget=”_self” image=”http://rhci.co/wp-content/uploads/2014/03/080312C.jpg” alt=””]
[image link=”” linktarget=”_self” image=”http://rhci.co/wp-content/uploads/2014/03/081012D.jpg” alt=””]
[/images]

Permalink Gallery

Fort Bragg Culinary Arts

Fort Bragg Culinary Arts

The Culinary Arts building was built after demo of existing structures and site improvements which included over excavation of loam soils. This new 2,262sqft classroom building included food service equipment and custom casework, some stainless steel tops. Fort Bragg is a well-known area but still required precision scheduling because many subcontractors were located two to six hours from the project. The only way to complete such a project under budget and on time was proper scheduling of subs and materials.

[images lightbox=”yes”]
[image link=”” linktarget=”_self” image=”http://rhci.co/wp-content/uploads/2014/04/FBHS-1-19-12-001.jpg” alt=””]
[image link=”” linktarget=”_self” image=”http://rhci.co/wp-content/uploads/2014/04/FBHS-1-19-12-005.jpg” alt=””]
[image link=”” linktarget=”_self” image=”http://rhci.co/wp-content/uploads/2014/04/FBHS-1-19-12-007.jpg” alt=””]
[image link=”” linktarget=”_self” image=”http://rhci.co/wp-content/uploads/2014/04/FBHS-1-19-12-004.jpg” alt=””]
[image link=”” linktarget=”_self” image=”http://rhci.co/wp-content/uploads/2014/04/bragg.png” alt=””]
[/images]